SLAC National Accelerator Laboratory

SPEAR Operator Messages

12-AUG-2015 12:04 We are in summer shutdown. We will be open for user operations starting November 9th.

SSRL BEAMLINES
Beamline Steering Periods Gap(mm) Field(T) K Pwr(W) Yield(Ah)
1 Closed Fault - 48.0 0.000 - 0 0.00
2 Closed Fault - 48.0 0.000 - 0 0.00
4 Closed 10 17.9 1.895 40.71 0 0.00
5 Closed 14 12.6 0.589 7.70 0 0.00
6 Closed Fault 27 16.0 0.850 5.55 0 0.00
7 Closed 10 17.4 1.932 41.51 0 0.00
8 Closed Fault - 48.0 0.000 - 0 0.00
9 Closed 8 24.6 1.929 49.61 0 0.00
10 Closed Fault 15 23.9 1.272 16.28 0 0.00
11 Closed 13 16.0 1.996 32.63 0 0.00
12-2 Closed 67 6.0 1.020 2.10 0 0.00
13 Closed 23 88.6 0.009 0.06 0 0.00
14 Closed Fault - 48.0 0.000 - 0 0.00
15 Open 86 8.0 0.780 1.60 0 0.00
Top-off mode: Disabled Total run electron beam current integral: 0.000 Ah

Detailed Accelerator and Beam Line Information