02-520 and 02-524 project
Project Description
The 02-520 and 02-524 project will renovate the entire 37,235 gsf of the existing buildings. The renovation will unify two separate buildings by creating a central atria entry. The joint structure will share circulation, elevator, stairs, and corridors. The scope of work includes extensive code upgrades (seismic, exiting, building infrastructure and total mechanical, engineering and plumbing systems (MEPS);elevator installation; restroom expansions and upgrades; the addition of several project- based teaching facilities; and the replacement of the Building 02-520 clerestory structural support system).
In addition, the scope will include limited exterior upgrades to be designed under the guidelines of the Panama Mall Master Plan.
Project Data
Department/School | Engineering |
---|---|
Architect | Cody Anderson Wasney |
Contractor | Hathaway Dinwiddie |
Gross Square Feet | 37,235 |
Construction Start | 7-21-14 Phase 2-Bldg 520 |
Project Manager | Wayne Kelly |
Project Website | N/A |
Current Activity
Current Work |
|
---|---|
Safety Reminders |
|
Notes |
Standard Work Hours: 6:00 AM - 3:30 PM Neighbor impacts include: Safety back-up beeps from misc. deliveries Noisy Work Hours: Starting at 2:00 AM - 10:00 AM Neighbor impact include: Saw-cutting & Jackhammering to be isolated to bldg. 520 |