Jump to main content or area navigation.

Contact Us

Technology Transfer Network - Air Toxics Web Site

Rule and Implementation Information for Flexible Polyurethane Foam Fabrication Operations


(Docket#A-2000-43)

On this page:


Rule Information

Proposed and Promulgated Rules

Subpart MMMMM--National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations
Date Citation Action Description File Download
04/14/2003 68 FR 18061 Final National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations; Final Rule
08/08/2001 66 FR 41717 Proposal Proposed rule for National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations

 


Technical Information

FACT Sheets

FACT SHEET for Proposed NESHAP: Flexible Polyurethane Foam Fabrication Operations
FACT SHEET for Final NESHAP: Flexible Polyurethane Foam Fabrication Operations

Implementation Information

Compliance and Enforcement Information

NOTE: The 4/14/2003 FR final rule gives existing loop slitters 1 year after that date to comply, or by 4/14/2004. Existing flame lamination sources have no emission limit, and thus no compliance date, but should have submitted an initial notification no later than 120 days after 4/14/2003, or by 8/12/2003.

 

Jump to main content.