NOTE: Older text-based electronic Federal Register notices do not contain
graphics or formulas.
Date
|
Citation
|
Action
|
Description
|
File Download
|
12/21/06 |
71 FR 76603 |
Final Rule |
National Emission Standards for Hazardous Air Pollutants for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical
Manufacturing Industry - Residual Risk and Technology Review; Final Rule |
|
06/14/06 |
71 FR 34422 |
Proposed rule; amendments |
National Emission Standards for Hazardous Air Pollutants for
Organic Hazardous Air Pollutants From the Synthetic Organic Chemical
Manufacturing Industry - Residual Risk and Technology Review; Proposed rule; amendments |
|
12/23/04 |
69 FR 76859 |
Direct Final |
National Emission Standards for Hazardous Air Pollutants for Source Categories: Organic Hazardous Air Pollutants From the Synthetic
Organic Chemical Manufacturing Industry and Other Processes Subject to
the Negotiated Regulation for Equipment Leaks-Direct Final |
|
12/23/04 |
69 FR 76894 |
Proposed Amendments |
National Emission Standards for Hazardous Air Pollutants for Source Categories: Organic Hazardous Air Pollutants From the Synthetic
Organic Chemical Manufacturing Industry and Other Processes Subject to
the Negotiated Regulation for Equipment Leaks |
|
01/20/00 |
65 FR 3169 |
Proposed Rule |
Proposed Amendments to National
Emission Standards for Hazardous Air Pollutants for Source Categories:
Organic Hazardous Air Pollutants From the Synthetic Organic Chemical
Manufacturing Industry and Other Processes Subject to the Negotiated
Regulation for Equipment Leaks |
|
12/9/98 |
63 FR 67787 |
Final Rule; correction |
Final rule amendments to clarify
definition of enhanced biological treatment system and to make conforming
edits to appendix C of Part 63 reflect the revised definition of
enhanced biological treatment system. This amendments also revises
compliance demonstration procedures for biological treatment units
to remove restrictions on the use of the batch test proceedure |
|
8/22/97 |
62 FR 44608 |
Proposed Rule; correction |
Proposal to clarify definitions
and to revise appendix C of Part 63. Also to revise compliance demonstration
procedures for biological treatment units to remove restrictions
on the use of the batch test proceedure |
|
3/24/97 |
62 FR 13882 |
Notice |
Request for approval of previously
approved collection. Renewal of OMB Approval Numbers Under the Paperwork
Reduction Act |
|
1/17/97 |
62 FR 02722 |
Final Rule; amendments |
These amendments are a complete
revision of the wastewater sections of subpart G and a revision
of the heat exchange system monitoring requirements in subpart F.
These amendments establish new compliance dates for wastewater provisions
and for monitoring of heat exchange system. There are miscellaneous
corrections and clarifications to other sections of the rule |
|
12/5/96 |
61 FR 64572 |
Final Rule; amendments |
Final action on clarifications
and elimination for filing some implementation plans. Allows for
filing of requests for compliance extensions |
|
8/26/96 |
61 FR 43698 |
Proposed Rule; amendments |
Proposal to revise the wastewater
sections of subpart G and to revise the heat exchange system monitoring
requirements in subpart F. These amendments would establish new
compliance dates for wastewater provisions and for monitoring of
heat exchange system. The proposal includes miscellaneous corrections
and clarifications to other sections of the rule. |
|
6/20/96 |
61 FR 31435 |
Final Rule; amendments |
Final rule amendments to remove
3 compounds from the list of chemical production processes regulated
by the HON to be later regulated by NESHAP for Polyether Polyols
Production. Proposal to clarify equipment leak requirements, correct
oversights and simplify demonstration of compliance |
|
2/29/96 |
61 FR 7761 |
Proposed Rule |
Proposal to Revise the date
for area source certifications and extension of deadline for submittal
of implementation plans |
|
2/29/96 |
61 FR 7716 |
Direct Final Rule |
Revision of date for area
source certifications and extension of deadline for submittal of
implementation plans |
|
12/12/95 |
60 FR 63624 |
Final Rule |
Correction of Hazardous Organic
NESHAP: "Technical Correction" |
|
4/10/95 |
60 FR 18078 |
Proposed Rule |
Proposal to correct errors
and clarify regulatory text of Hazardous Organic NESHAP |
|
4/10/95 |
60 FR 18026 |
Direct Final Rule |
Corrects errors and clarifies
regulatiory text of Hazardous Organic NESHAP. |
|
4/10/95 |
60 FR 18071 |
Proposed Rule; clarification |
Proposal to remove 3 compounds
from the list of chemical production processes regulated by the
HON to be later regulated by NESHAP for Polyether Polyols Production.
Proposal to clarify equipment leak requirements, correct oversights
and simplify demonstration of compliance |
|
4/10/95 |
60 FR 18020 |
Final Rule; amendments |
Final amendments to extend
the compliance date for certain compressors and for surge control
vessels and bottom receivers and deferral of HON requirements for
sources wishing to make an area source certification |
|
1/27/95 |
60 FR 05320 |
Final Rule |
NESHAP: Organic Hazardous
Air Pollutants from the SOCMI and other Processes Subject to the
Negociated Regulation for Equipment Leaks; Extension of Compliance |
|
10/28/94 |
59 FR 54154 |
Proposed Compliance Extension
and Proposed Changes to subpart H |
Proposal to extend the compliance
date for certain compressors and for surge control vessels and bottom
receivers. Proposal also includes a temporary extension beyond the
3 month period of the stay |
|
10/28/94 |
59 FR 54131 |
Notice of Partial Stay and
Reconsideration |
Partial 3-Month stay and reconsideration
for compressors and for surge control vessels and bottom receivers. |
|
10/24/94 |
59 FR 53392 |
Proposed Amendments |
Proposal to provide addition
of time for ensuring area source designation and exemption from
HON NESHAP |
|
10/24/94 |
59 FR 53359 |
Notice |
Partial 3 month stay of the
"HON" and reconsideration |
|
9/20/94 |
59 FR 48175 |
Correcting Amendments |
NESHAP:Organic Hazardous Air
Pollutants from the Synthetic Organic Chemical Manufacturing Industry
and Other Processes Subject tot he Negotiated Regulation for Equipment
Leaks; Correction |
|
6/23/94 |
59 FR 32339 |
Technical Amendment |
OMB Approval Numbers Under
the Paperwork Reduction Act |
|
6/6/94 |
59 FR 19402 |
Final Rule |
NESHAP:Organic Hazardous Air
Pollutants from the Synthetic Organic Chemical Manufacturing Industry-determination
of MACT "Floor". Final decision on medium storage vessels at HON
facilities |
|
4/22/94 |
59 FR 19402 |
Final Rule |
NESHAP:Organic Hazardous Air
Pollutants from the Synthetic Organic Chemical Manufacturing Industry
and Other Processes Subject to the Negotiated Regulation for Equipment
Leaks |
|
3/9/94 |
59 FR 11018 |
Proposed Rule |
NESHAP:Organic Hazardous Air
Pollutants from the Synthetic Organic Chemical Manufacturing Industry
and Other Processes Subject to the Negotiated Regulation for Equipment
Leaks; Determination of MACT "Floor"-comment period re-opened |
|
12/31/92 |
57 FR 62608 |
Proposed Rule |
NESHAP:Organic Hazardous Air
Pollutants from the Synthetic Organic Chemical Manufacturing Industry
and Other Processes Subject to the Negotiated Regulation for Equipment
Leaks; |
|