Upload
1,794
  • Overnight Shift in the Richmond Tower

    3K views 2 weeks ago
    While most the Bay Area sleeps during the overnight hours our trackways, yards, shops and towers are buzzing with employees preparing for the next commute and keeping our equipment in safe working order.
    We recently offered a glimpse at the critical track work that takes place while we are shut down for the night. Now, we are pulling back the curtain with a rare look at the overnight work done inside the Richmond tower and shop to show what it takes to get our trains ready by dawn. This effort is a rhythmic orchestration of men and women, train cars, and the conductor that oversees it all from a tower. Take a look. Show less
    Read more
  • Uploads Play all

    This item has been hidden
  • Ask BART Play all

    Do you have a question about something you've seen, experienced or wondered about on BART? Ask BART and we'll track down the answer.
    This item has been hidden
  • BART Basics Play all

    How to navigate and understand BART parking, stations, and cars.
    This item has been hidden
  • BART News Play all

    What is going on with BART? Catch up on the latest about BART.
    This item has been hidden
to add this to Watch Later

Add to

Loading playlists...