Bicycle Access and Parking Plan: Implementation Strategy

During 2013 and 2014, Caltrain staff worked with the Caltrain Bicycle Advisory Committee to refresh the 2008 Caltrain Bicycle Access and Parking Plan with a new implementation strategy.

Bike Access and Parking Implementation Plan (2014) (PDF, 997 KB)

The Implementation Strategy will help Caltrain work with its partners and local communities to implement and improve bicycle access and parking throughout the system. The strategy outlines staff’s recommended approach for implementing and evolving the wayside bicycle improvements identified in the 2008 Bicycle Access and Parking Plan (BAPP) into a rolling improvement program. The Bicycle Access and Parking Program will update annually, improving Caltrain’s bicycle infrastructure and maximizing the use of available funding and resources. Periodic updates related to the Bicycle Access and Parking Program will be made to the Bicycle Advisory Committee.

3/9/15 - sp/rjc


Bicycle Access and Parking Plan (2008)


The original Caltrain Bicycle Access and Parking Plan was completed and adopted in 2008. To download a copy of the Draft Bicycle Access and Parking Plan click on the links below. The projects and recommendations in this plan may be reviewed and updated as defined in the “Implementation Strategy” described above.

Plan only (PDF, 1.72 MB)
Appendicies only:
Appendix A (PDF, 85KB)
Appendix B: Part 1 San Francisco County (PDF, 2.79MB)
Appendix B: Part 2 San Mateo County (PDF, 3.97MB)
Appendix B: Part 3 Santa Clara County (PDF, 2.98MB)
Appendices C-H (PDF, 1.02MB)

 

In developing the plan, Caltrain sought extensive public comments from the public through a series of station workshops, three community meetings, a number of technical advisory group meetings, as well as two public comment periods. To view the summary comments from the Key Findings summarized at the August 2008 board meeting, and the summary comments and responses to the Draft Bicycle Access and Parking plan, please click on the links below:

Summary of Comments On Key Findings (PDF, 14.3 KB)
Summary of Comments On Draft Bike Plan (PDF, 15.3 KB)

The final plan was presented to the Caltrain Board for approval at its Oct. 2, 2008 meeting.