SLAC National Accelerator Laboratory
Beam Current: 0.00 mA Beam Status: Down Loss Rate: 0.00 mA/min
SPEAR Plot

SPEAR Operator Messages

1-AUG-2017 06:00 Annual Summer Shutdown for maintenance

SSRL BEAMLINES
Beamline Steering Periods Gap(mm) Field(T) K Pwr(W) Yield(Ah)
1 Closed - 48.0 0.000 - 0 0.00
2 Closed - 48.0 0.000 - 0 0.00
4 Closed 10 168.0 0.117 2.52 0 0.00
5 Closed 14 120.0 0.017 0.22 0 0.00
6 Closed 27 176.0 0.061 0.40 0 0.00
7 Closed 10 167.6 0.118 2.53 0 0.00
8 Closed - 48.0 0.000 - 0 0.00
9 Closed 8 191.5 0.125 3.22 0 0.00
10 Closed 15 200.0 0.011 0.14 0 0.00
11 Closed 13 165.0 0.065 1.06 0 0.00
12-1 Closed 77 18.5 0.105 0.19 0 0.00
12-2 67 18.5 0.191 0.39 0
13 Closed 23 192.0 0.000 0.00 0 0.00
14 Closed - 48.0 0.000 - 0 0.00
15 Closed 86 29.5 0.036 0.07 0 0.00
16 Closed - 48.0 0.000 - 0 0.00
Top-off mode: Disabled Total run electron beam current integral: 0.000 Ah

Detailed Accelerator and Beam Line Information