You are here:
Center Hill Facility
20,468 gross square feet (GSF)
Personnel: 30
Energy Intensity:
FY 2014: 271,682 Btu per GSF
7.2% increase from FY 2003 baseline
Water Intensity:
FY 2014: 35.73 gallons per GSF
10.3% reduction from FY 2007 baseline
Cincinnati, Ohio
Part of EPA’s second-largest large research and administrative campus, the Center Hill Facility specializes in municipal solid waste research, including disposal, residuals management, soil contamination, and risk reduction engineering.
Sustainable Features
- By using a nighttime setback mode for its heating, ventilation, and air conditioning system, the facility cuts its energy demand in half on nights, weekends, and holidays.
- Energy-efficient lights in the office and high bay areas help reduce energy consumption.
For more information, visit Center Hill Facility website.