Alma Street & Middlefield Road Paving Project
This contract will repave sections of Alma and Middlefield with new rubberized asphalt to improve the condition of the road. Prior to repaving, the streets will have damaged curbs, gutters, sidewalks, driveway aprons, and concrete road base repaired. For more information please view the project flyer and the staff report.

Contractor: O'Grady Paving, Inc.
Project Manager: Matt Brunnings
Project Engineer: Murdo Nicolson 
Dates: July 2015 – November 2015



FY 2016 Preventive Maintenance Project
This contract will apply a slurry seal on project streets to provide a new roadway surface and prevent further deterioration. Prior to the application of the slurry seal, the Contractor will perform preparation work that typically includes “spot repairs”, removal of existing striping, and crack sealing. For more information please view the project 
flyer and the staff report.

Contractor: Graham Contractors, Inc.
Project Manager: Holly Boyd
Project Engineer: Roger Nguy
Dates: July 2015 – October 2015 



FY 2015 Asphalt Paving Project
This contract will repave project streets with new asphalt to improve the condition of the road. Prior to repaving, the streets will have damaged curbs, gutters, sidewalks, driveway aprons, and concrete road base repaired. For more information please view the project
flyer and the staff report.

Contractor: C.F. Archibald Paving, Inc.
Project Manager: Holly Boyd
Project Engineer: Murdo Nicolson
Dates: February 2015–July 2015


We will update this page whenever there are significant changes to the project schedules. You may contact us via email at