C15160 Light Rail Transit Information Display
|
Florante Tanada |
|
8/12/15 |
|
8/18/15
10:00 AM |
|
8/26/15
11:00 AM |
|
Awarded |
|
Before downloading this contract document for C15160, please see Summary information.
Requires the California State Contractors License Board: Class B, C-7 or C-10.
Engineer Estimate Range is $40,000 -$80,000.
This project consists of installing VTA furnished Light Rail Transit Information Displays (LCD display units), with truss and NEMA enclosures including mounting brackets, and connecting them to existing visual message sign (VMS) power wiring and communication cables at twenty VTA light Rail Stations locations. The LCD display units shall replace existing VMS signs at certain locations. The work also includes installation of NEMA Boxes & mounting equipment within the NEMA Boxes and or outside per VTA direction. The work shall include furnishing and installing additional power wiring, communication cables and other equipment as shown on the plans and specs and to perform other work necessary including testing to integrate and make these units functional and operational per manufacturer’s requirements.
The time of Completion shall be 110 calendar days.
SBE Goal: NSG
To register and download the contract:
Please register at VTA's website as a vendor and then download the Contract Documents.
http://www.vta.org/about-us/procurement/vendor-settings?action=Register
The contractor is responsible to download the complete Contract Documents and addenda. |
In order to download attachments, enter your email below and click Check.
Attachments
|
C15160-Covers for Contract Documents.pdf | 8/24/15 4:32 PM | Submit Information Below | C15160 Contract Documents.pdf | 8/24/15 4:32 PM | Submit Information Below | C15160 Tech Specs - LCD Display Units - Light Rail.pdf | 8/24/15 4:32 PM | Submit Information Below | C15160 -Contract Drawings.pdf | 8/24/15 4:32 PM | Submit Information Below | C15160-Appendix A Restricted Access Permit.pdf | 8/24/15 4:32 PM | Submit Information Below | Attachment to RFI 1 and 2-ENCLOSURE-WELDMENT1_RevV5.pdf | 8/24/15 4:36 PM | Submit Information Below | RFI # 1 and #2 (consolidated).pdf | 8/24/15 4:36 PM | Submit Information Below | Summary of Bids.pdf | 8/26/15 12:20 PM | Submit Information Below |
|