VTA BART Silicon Valley color logo

The Web VTA BART Silicon Valley
Image of nightshot of an open agricultural field with water treatment equipment spraying water.
Home > Environmental > Envionmental Reports > Draft 2nd SEIR 2011
Draft 2nd SEIR (2011) Summary
 

VTA distributed a Notice of Preparation (NOP) that a Draft 2nd Supplemental Impact Report (SEIR2) would be prepared on August 13, 2010. VTA hosted a public scoping meeting for the Draft SEIR2 on September 1, 2010. At the meeting, VTA made a presentation and accepted public comments. Scoping comments were accepted until the end of the comment period, which was September 13, 2010. All comments received during the scoping period were taken into consideration during the preparation of the Draft SEIR2. VTA prepared a Draft SEIR2 to address proposed project changes since the certification of the Final SEIR in 2007. For example, the project now will be constructed in phases. Phase 1 would begin at the approved BART Warm Springs Station in Fremont and end in the Berryessa area of San Jose. The SEIR2 addresses changes in the project design for Phase 1 only. The Draft SEIR2 was circulated from November 1, 2010 through December 17, 2010.

 

Draft 2nd Supplement EIR (2011)

VTA HOME

BART Silicon Valley Program Office, 1436 California Circle, Milpitas, CA 95035
Copyright © 2014 Santa Clara Valley Transportation Authority (VTA). All rights reserved.