Home>Bus Rapid Transit>Alum Rock/Santa Clara>Library
Library
What are you looking for?
Environmental Documents
Addendums
- Addendum 1 (PDF 1,123K)
- Appendix A - Preliminary Station Architectural Platform Plans
- Appendix B - Supplemental Traffic Analysis (PDF 7K), May 2010 (PDF 151K); Supplemental Traffic Analysis, June 2011 (PDF 1,132K)
- Appendix C - Climate Change Update (PDF 176K)
- Appendix D - Phase 2 Preliminary Site Assessment Report and Groundwater Maps (PDF 1,632K)
- Appendix E - Preliminary Right of Way Map (PDF 3,227)
- Appendix F - Tree Inventory Report and Preliminary Irrigation and Planting Plans (PDF 17,328K)
- Addendum 2 (PDF 14,794K)
Final Environmental Impact Report Volume 1
- FEIR Cover (PDF 538K)
- FEIR TITLE (PDF 340K)
- 0 TOC volume 1 (PDF 76K)
- 1 Introduction (PDF 76K)
- 2 Project Description (PDF 4530K)
- 3.01 Intro Environmental Analysis (PDF 65K)
- 3.02 Transportation (PDF 2,836K)
- 3.03 Air Quality (PDF 258K)
- 3.04 Biological Resources (PDF 1,864K)
- 3.05 Community Services (PDF 677K)
- 3.06 Cultural Resources (PDF 203K)
- 3.07 Electromagnetic Fields (PDF 78K)
- 3.08 Energy (PDF 431K)
- 3.09 Climate Change (PDF 128K)
- 3.10 Soils Geology and Seismicity (PDF 478K)
- 3.11 Hazardous Materials (PDF 399K)
- 3.12 Hydrology and Water Quality (PDF 562K)
- 3.13 Land Use (PDF 355K)
- 3.14 Noise-Vibration (PDF 556K)
- 3.15 Safety and Security (PDF 76K)
- 3.16 Population & Housing (PDF 109K)
- 3.17 Visual Quality (PDF 4,729K)
- 3.18 Construction Impacts (2,617K)
- 4.0 Other CEQA Considerations (PDF 154K)
- 5.0 Agencies Organizations and Individuals (PDF 64K)
- 6.0 List of Preparers (PDF 55K)
- 7.0 Glossary and Acronyms (PDF 75K)
- 8.0 Comments and Responses (PDF 13,515K)
- Summary (PDF 1,788K)
Final Environmental Impact Report Volume 2, Appendix
- 00 FEIR Title Vol 2 (PDF 365K)
- 0 Appendices Divider (PDF 33K)
- 0 FEIR COVER Vol 2 (PDF 233K)
- 0 TOC Vol 2 (PDF 76K)
- Appendix A NOP 2007 (PDF 41K)
- Appendix B Plan Sheets (PDF 13, 761K)
- Appendix C Transportation Study 9-25-07 w_Addendum (PDF 2,613K)
- Appendix D SC-AR Operating Maintenance Tech Memo 12-6-07 (PDF 291K)
- Appendix E Air Quality Study Tech Report (PDF 1,889K)
- Appendix F mocpa_energy-6.30.08 (PDF 335K)
- Appendix G 1 mocpa_noise_7.1.08_2nd_version (PDF 1,439K)
- Appendix G2 mocpa_noise_BRT_appendix_7.2.08_revised (PDF 18,290K)
- Appendix G3 mocpa_noise_LRT_appendix_7.1.08 (PDF 14,650K)
- Appendix H ISA Tech Report (PDF 2,121K)
- Appendix I Bio Tech Report (PDF 2,703K)
In the News
- March 19, 2013
- November 8, 2013
Multimedia (Images & Videos)
- Download Alum Rock/Santa Clara Bus Rapid Transit rendering at King Road and Alum Rock Avenue (high res)
Connect with VTA
twitter icon facebook icon youtube icon instagram icon mail icon